Article 5 of supporting law of electricity of
the country:
The government is obliged to foresee the toll
of consumption of each KWh electricity for providing a portion of required
monetary resources in annual budget over implementing of the development and
maintenance of rural grids and generation of electricity from renewable and
clean sources. The acquired money would be deposited to the national treasury,
Tavanir Company and 100% of it will be allocated only to implement the
mentioned projects.
All ministries especially petroleum and
energy and all the subsidiaries companies are allowed to conclude contracts of 100
billion dollars (currency), 500,000 billion Rials which is adjusted with the
inflation rate of the last year. Real or legal person, foreign or local with
the priority of private sector cooperation to produce, export, improvement of quality,
saving, decreasing the cost of product or service, environment improvement and
decreasing financial losses.
The government is obliged to:
1) Purchase the product or service
2) To pay all the profit of investment, governmental
rights, regulatory tolls and other costs subject to the article.
In case of financing of all or part of the
required sources of parts 1 and 2 from the whole budget of the country if will
be done by exchanging an agreement between management and planning organization
of the country through the national treasury.
A) Energy efficiency projects in different
sectors: industry with the priority of energy consumer, public railroads and
suburban, building, renewable energy deployment, promoting the use of
compressed natural gas with the priority of big cities and main roads,
production and replacement of high consumption and old vehicles with low
consumption or electrical vehicles, reduction in cost of loads, railroad
transportation, sea and air routes including infrastructure, projects which
lead to mitigation of green gas houses, machinery and agriculture manufacturing
units.
B) Power plant construction projects with
high efficiency, increase in production and efficiency of power plant that lead
to the increase in thermal efficiency with the priority of installing the gas
in CHP, coldness and heat (CCHP), Distributed Generation (DG), decrease in loss
of energy in production, transmission and distribution, optimizing and energy
saving in electricity and energy consumption, electrifying agriculture wells
with the priority of using renewable sources such as solar, replacement of gas
and petroleum products with electricity in areas that is economically feasible.